November 18, 2026

Tennis Bracelets Wholesale: First-Order Landed Cost Math

Bench notes · The Journal

Tennis Bracelets Wholesale: First-Order Landed Cost Math

01Why your first tennis bracelet quote never matches the invoice

Most buyers open a tennis bracelets wholesale file with one number in mind: the unit price. Then the invoice lands and it is 18 to 25 percent higher than the quote that got them excited. That gap is not a scam. It is the difference between an ex-works price and a landed cost, and it is the single most common mistake I see from new trade buyers.

I have spent 12 years on the QC floor here, checking stone parcels and signing off pre-shipment inspections. This piece is the math I walk buyers through on a first order, using a 7-inch, 3mm, 2.5ct total weight sterling silver bracelet as the working example. Change the specs and the percentages shift, but the line items do not.

02The five cost blocks in any tennis bracelet

Everything that goes into a tennis bracelet price sits in five buckets. If a supplier cannot break their quote into these five, you are talking to a trader, not a factory.

Stone cost: moissanite or lab-grown diamond, priced per carat by size, color and clarity band.
Metal cost: 925 silver weight in grams, or gold karat weight if you go that route, plus solder and findings.
Labor: setting, polishing, rhodium plating, and the clasp assembly.
Compliance: certificates, testing, and any hallmarking your market requires.
Logistics: export packing, freight, insurance, duty, and the last-mile delivery to your door.

Stone cost per carat is where the spread hides

For a 3mm round moissanite bracelet at 2.5ct total, the stone parcel is the biggest single line and also the easiest to fudge. Two suppliers can quote "2.5ct moissanite" and be 40 percent apart because one is using a lower clarity band or mixing sizes from a cheaper sieve. Ask for the stone spec in writing: size in mm, clarity grade, color grade, and whether it is GRA-certified per parcel.

Lab-grown diamond changes the math considerably. A comparable 3mm lab-grown parcel runs several times the moissanite cost, so your landed cost per unit roughly doubles before freight even enters the picture. That is fine if your retail price supports it, but do not let a supplier swap the stone category mid-negotiation without re-quoting.

03A worked landed cost example, 100 pieces

Here is a real-world structure for 100 pieces of the 3mm silver moissanite bracelet, DDP to a US warehouse. These are illustrative numbers, not a quote, but the proportions are what matter.

Cost blockBasisPer unit (USD)Share of landed
Stones2.5ct moissanite parcel14.0031%
Silver and findings~9g 925 silver12.5028%
Labor and platingSetting, polish, rhodium8.0018%
Certificates and packingGRA per piece, IGI on request2.004%
Freight, duty, deliveryDDP, 5-8 days8.5019%

Add those up and your landed cost is around 45 USD per unit. Notice that logistics is nearly a fifth of the total. Buyers who only compare the ex-works number are comparing 69 percent of the real cost and ignoring the rest.

Where the hidden 15 percent lives

Three items routinely get left out of a first-order budget. First, duty and import VAT, which vary by destination and HS code and are almost never in the factory quote unless it is DDP. Second, certificate costs if your buyer demands IGI rather than GRA, which adds per-piece and can add lead time. Third, payment friction: T/T transfers carry bank fees on both ends, and if you pay a 30 percent deposit by T/T and the balance by T/T, you can lose 40 to 80 USD on a small order in fees alone.

On a first order under 5,000 USD, bank fees and certificate upgrades often cost more than the per-unit price difference between two factories. Negotiate the spec, then negotiate the terms.

04MOQ, lead time and how they hit your cash flow

MOQ is not just a quantity rule, it is a cash-flow rule. We run 1 piece MOQ on stock designs and 30 pieces for custom specs, which means a first order can be small enough to test a style without freezing capital. Production on a 100-piece run sits at 12 to 18 days after deposit and stone approval.

That timeline matters because your deposit leaves your account on day zero and your sellable inventory arrives around day 25 to 30 once you add DDP transit of 5 to 8 days. Plan your launch date from the arrival date, not the order date. Buyers who count backward from a trade show and forget the transit window are the ones paying express freight later.

Why factory-direct beats trading companies on this math

Our cost, speed and yield run about 20 percent better than typical trading companies, and the reason is structural rather than promotional. We buy stone parcels directly and cut the middleman margin, we control the setting bench in-house so rework does not become a second shipment, and our three-stage QC (incoming stone check, in-process inspection, pre-ship AQL sampling) catches defects before they become freight. A trader pays for all three of those steps and adds a margin on top.

05Building your first-order budget the right way

Start from the landed number and work backward to a target retail. If your landed cost is 45 USD and your channel needs a 2.5x keystone, your retail sits near 112 USD. If that retail does not work in your market, the fix is spec, not supplier: drop to a smaller total carat weight, adjust the silver gauge, or move from lab-grown to moissanite.

Get the stone spec in writing before comparing prices.
Ask every supplier to quote DDP so the numbers are comparable.
Budget certificates separately and confirm which body your buyer accepts.
Add 3 to 5 percent contingency for bank fees and small spec changes.
Order a sample by PayPal before committing a deposit.

A sample costs you a small amount and answers the two questions that matter: is the setting tight, and does the clasp survive handling. PayPal keeps the sample transaction fast and low-risk, then the production order moves to T/T with a 30 percent deposit and balance before shipment.

06Frequently Asked Questions

What is the MOQ for a first tennis bracelets wholesale order?

We hold 1 piece MOQ on stock designs and 30 pieces for custom specifications, so a first order can be as small as a single test unit. Custom orders below 30 pieces are usually possible for stock stones but not for new stone parcels. Price basis is per piece, quoted ex-works or DDP.

How long does production and delivery take?

Production runs 12 to 18 days after deposit and stone approval, and DDP delivery adds 5 to 8 days depending on destination. Certificates can add a few days if you need IGI rather than GRA. Plan your launch from arrival, not from order date.

What is included in the quoted price?

Our standard quote is per piece and covers stones, silver, labor, plating and GRA certification, with IGI available on request. Duty, VAT and freight are only included when the quote is marked DDP. Always confirm the Incoterm before you compare two suppliers.

07Get the numbers for your spec

Send us your bracelet spec, target quantity and destination market, and we will return a line-item breakdown with stones, metal, labor, certificates and DDP freight separated so you can see exactly where the money goes. If you would rather hold the product first, request a sample and we will quote it by PayPal the same week. Reach the team at service@holycome.com or WhatsApp +86 133 7744 7107.

Questions about your own design?

Send a sketch or a photo — our setter will answer with stone options and a price band.

Talk to the atelier

Have a question about what to choose? We will help you weigh it for free.

Talk to the Atelier

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .