November 18, 2026

Bridal Sets Wholesale: Landed Cost Math for a First Order

Bench notes · The Journal

Bridal Sets Wholesale: Landed Cost Math for a First Order

01Why your first bridal sets wholesale quote never matches the invoice

Most buyers come to us with a target price per set. They leave with a landed cost that is 25 to 40 percent higher, and the gap is almost never the factory price. It is freight, duty, certificate handling, and the small rework costs that show up when a shipment fails inspection at the port.

I have been on the QC floor for twelve years. I have watched first orders die over a $0.60 per-set difference in freight allocation, and I have watched buyers save thousands by understanding what actually moves the number. This is the math I walk every new account through before they wire a deposit.

02Build the unit cost from the parts, not the photo

A bridal set is a ring stack, usually an engagement ring plus one or two bands, sold as a coordinated unit. Buyers see a finished photo and a single price. On our side, that price is four separate lines: metal, stone, labor, and setting.

The four cost components

Metal: 925 sterling silver is priced by weight plus a small fabrication premium. A typical three-piece set runs 6 to 9 grams total.
Stones: moissanite is graded and priced per carat by size and color. DEF colorless commands more than GHI, and small melee carries a different rate than center stones.
Labor: setting density drives this line. A pave band with 40 tiny stones takes far more bench time than a solitaire with a hidden halo.
Finish and plating: rhodium plating, polishing, and any two-tone treatment are quoted per piece.

When you ask for a quote, ask for it broken into these four lines. A supplier who quotes one number is either hiding margin or guessing at the stone count. Both are problems for you at scale.

Lab-grown diamond sets change the ratio

If your assortment includes lab-grown diamond bridal sets, the stone line jumps and the metal line becomes almost irrelevant. A 1.00 ct lab-grown center stone can cost more than the entire silver mounting. This is why we quote lab-grown and moissanite sets separately, never as a blended average.

03The landed cost formula for a first order

Landed cost equals unit price times quantity, plus freight, plus duty and import fees, plus certificate costs, plus payment fees, plus an allowance for defects and rework. Divide that by the number of sellable units, not the number you ordered.

That last point matters. If you order 200 sets and 6 fail final inspection, your true landed cost is the total spend divided by 194. On a first order, plan for a 2 to 4 percent defect allowance even with a good factory. Anyone promising zero is not inspecting.

Line itemTypical basisFirst-order note
Unit pricePer set, by design and stone countCustom tooling or new CAD adds a one-time fee
FreightPer kg or per carton, DDP 5-8 daysDDP bundles duty and clearance into one rate
Duty and importBy declared value and HS codeUS and EU rates differ; confirm the code
CertificatesPer stone or per setGRA plus IGI on center stones adds cost
Payment feesPercentage of transactionT/T 30% deposit; PayPal for samples

Why DDP is usually the right call for order one

DDP means the freight quote includes delivery to your door with duty and clearance handled. It costs a little more per kilo than FOB, but it removes the customs broker invoice that surprises first-time importers three weeks after the goods land. For a first order, predictability beats the last 4 percent of freight savings.

04The MOQ decision that changes your math

Our stock designs ship at MOQ 1 pc. Custom designs, meaning your CAD or your modification, run at MOQ 30 pcs per style. That split is not arbitrary. Stock is already in the tray, already photographed, already inspected. Custom means a new mold, a new setting layout, and a bench slot reserved for your run.

For a first order, the smart play is a mixed cart: 60 to 70 percent stock bestsellers to test the market fast, 30 to 40 percent custom in two or three hero styles to build your own look. You get real sell-through data in six weeks instead of committing your whole budget to unproven designs.

Where the 20 percent advantage comes from

Our cost, speed, and yield run roughly 20 percent better than typical trading companies. The reason is structural, not a discount. We cut and set in the same building where we inspect, so a stone rejection happens at the bench, not after a container is packed. Trading companies pay a factory, wait for the report, and absorb the rework in their margin. We remove that layer.

05Production timeline and the three QC gates

Standard production runs 12 to 18 days after deposit and CAD approval. That clock starts when both are in hand, not when you send the inquiry. Plan your launch date backward from that.

Every order passes three inspection stages. First, incoming stone check: every parcel of moissanite or lab-grown is verified for grade, measurement, and color before it reaches a bench. Second, in-process check at setting, where we catch loose prongs and misaligned melee before polish. Third, pre-ship AQL sampling on the finished, plated goods, using an accepted quality level that matches your order size.

Ask for the AQL level in writing before you pay. A factory that cannot name its sampling standard is not sampling.

Certificates are issued alongside: GRA for the moissanite, and IGI for lab-grown center stones where the grade needs third-party backing for your retail listing.

06Payment terms and what to hold back

Standard terms are T/T with 30 percent deposit and the balance against the pre-ship inspection report. For samples, PayPal is fine and faster for both sides. Never pay the full balance before you see the AQL result, even on a small first order. The leverage is the whole point of staging payments.

Delivery on DDP runs 5 to 8 days to most US and EU addresses once goods leave. Add customs clearance time in peak season, and build a two-week buffer into any date you promise a buyer.

07Frequently Asked Questions

What is the minimum order for bridal sets wholesale?

Stock designs start at MOQ 1 pc, so you can sample a single set before committing. Custom designs with your CAD or modifications require MOQ 30 pcs per style. Mixed orders combining both are welcome.

How long does a first order take from deposit to delivery?

Production takes 12 to 18 days after deposit and CAD sign-off, then 5 to 8 days DDP transit. First orders with new CAD add a few days for design approval before the production clock starts.

How is the price per set calculated?

Pricing is per set, built from metal weight, stone grade and carat, setting labor, and finish. Lab-grown diamond sets quote higher on the stone line, while moissanite sets keep most of the cost in labor and setting density.

Send your design list or reference photos to service@holycome.com or WhatsApp +86 133 7744 7107, and I will return a line-by-line quote with the landed cost worked out for your destination, plus a sample plan you can approve before the deposit.

Questions about your own design?

Send a sketch or a photo — our setter will answer with stone options and a price band.

Talk to the atelier

Have a question about what to choose? We will help you weigh it for free.

Talk to the Atelier

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .